Anvil International
CASE STUDIES
Anvil’s Gruvlok Couplings Speed Up GTC Installation Time
With Anvil International’s Gruvlok® products and support, General Temperature Control (GTC) shaved months off its timeline for a school building proje…
Sauer Group Selects Anvil Products to Support the World’s Tallest Launch Pad Water Tower
To support a massive water tower for a NASA launch pad, Sauer Group Inc. employed Anvil pipe supports and rollers for their durability and history of …
Smooth Sailing for Seattle’s Floating Bridge Thanks to Anvil Products
For Seattle’s new State Route 520 Evergreen Point Floating Bridge, Diamond B Constructors, Inc. knew they could count on Anvil International for flexi…
Bennell, Inc., Overcomes a Tight Squeeze Thanks to Anvil International’s Creative Gruvlok System Design
Savvy design from Anvil® International allowed Bennell, Inc. to install all the needed systems in the very small mechanical room of a new residence ha…
KOH Mechanical Saves Up to 40 Percent with Anvil’s Gruvlok Products
For KOH Mechanical Contractors, Inc., the labor savings realized with Anvil® International’s Gruvlok© Products made them the clear choice for keeping …
Rock Hill Mechanical Meets Tight Timeline Thanks to Anvil International
Rock Hill Mechanical knew that Anvil International’s Gruvlok® system was a better choice for a new aquarium’s mechanical room than the originally spec…
Holmberg Mechanical Saves Time, Meets Regulatory Requirements with Help from Anvil International
Holmberg Mechanical knew Anvil International’s Gruvlok® products would help them meet the quick turnaround time required for the new Colman Dock in Se…