Smart Solutions case studies highlight how MCAA contractors and Manufacturer/Supplier Council members collaborate to improve productivity, manage costs, and solve real‑world project challenges. Each case study focuses on practical applications of products, technologies, and processes that deliver measurable results across mechanical construction, service, fabrication, and operations.
Through real project examples, Smart Solutions provides insight into how contractors are applying innovative solutions to streamline workflows, improve coordination, and enhance overall performance. Explore the case studies below to identify ideas, approaches, and proven practices that can be adapted to your own operations.
John W. Danforth Company wanted a lean jobsite for its new hospital project, so it worked closely with Zurn on packaging materials and delivery schedules long before any materials were needed, saving time and money in the process. The new Wynn Hospital of Utica, NY, part of the Mohawk Valley Hospital System, opened in October 2023 on time and on budget.
John W. Danforth Company installed a new hot water system in a nursing home without incident and with minimal disruption, thanks in part to Ferguson’s expertise in selecting the ideal replacement system. The new system improved overall efficiency for the nursing home and will be easier to maintain than the old system.
John W. Danforth—a founding member of MCAA—is using Raken’s digital time cards and daily reporting to keep a record of all the impacts the pandemic has had on their productivity—so they can demonstrate what they have done and get paid for it. Construction companies have been forced to change the way they operate to ensure safety and compliance, and jobsite data are critical for contractors to maintain a record of productivity and streamline their workflows.
Using black iron pipe for Buffalo General Hospital’s expansion project saved John W. Danforth Company material costs, while the new Viega MegaPress® carbon steel pipe joining system helped them make clean, consistent black iron pipe connections. Rich Mueller, Danforth’s project manager, said Danforth saved money in two different ways by installing Viega MegaPress. “First, we saved on the cost of the black pipe compared to the copper. And second, we saved on labor by using pressing instead of threading the black pipe.”
In the early months of the COVID-19 pandemic, The Waldinger Corporation had several projects delayed or cancelled, while the John W. Danforth Company needed additional detailing support. Using GTP Services’ STRATUS software, they successfully collaborated on a large project, to the benefit of both companies. STRATUS allowed the contractors to share resources and also digitize their paper-based workflow, eliminating mistakes and increasing productivity.
A new, state-of-the-art hospital in New York required that John W. Danforth Company use solder connections for mechanical piping and press fittings for the plumbing, so they looked to a trusted and reliable partner, Mueller Streamline Co., a primary subsidiary of Mueller Industries, that could provide both. That decision has paid off with a smooth construction process to date, supported by building information modeling (BIM) technology that ensured accuracy for prefabrication. Mueller Industries, Inc. is a major sponsor of MCAA23.
To keep on track with its project timeline, John W. Danforth Co. turned to Erickson Incorporated, a global provider of innovative aerial services, to place 44 sections of rooftop HVAC units securely in place in just one day. Erickson flew a Sikorsky S64 Aircrane helicopter above SolarCity’s 1.2-million-square-foot factory in Buffalo, NY. The Aircrane has a 25,000-pound lift capacity and easily carried the HVAC units—weighing between 14,000 and 18,000 pounds—in less than seven hours.