When the scoreboard of the original Orlando Citrus Bowl Stadium was torn down in January 2014, the project team began a hurry-up offense to complete a roughly $200-million renovation in only ten months. Zurn Industries, LLC was drafted to provide its products and to meet the challenges of an expedited project timeline with made-to-order requirements.
Chicago Cubs’ Spring Training Facility To Be Named Sloan Park
Major League Baseball’s Chicago Cubs specified Illinois-based Sloan Valve Company’s plumbing systems for its spring training facility in Mesa, AZ. Recently, the Cubs announced that Sloan has joined the organization as a Legacy Partner and the team’s Official Water Efficiency Partner. As part of this agreement, the Cubs’ spring training facility will be named Sloan Park.
Mitsubishi Electric’s VRF Zoning Systems Slash Electric, Gas Costs for Franklin Energy
By installing a Variable Refrigerant Flow (VRF) zoning system from Mitsubishi Electric US Cooling & Heating Division in its new headquarters, Franklin Energy Services, LLC saved 32 percent in electricity and 48 percent in gas in its first year, compared with average usage for a comparable building. The savings are all the more impressive because the new headquarters are in a historic building in Port Washington, WI.
Sauer Group Increases Productivity by 300 Percent with Tri Tool High-Performance Welding Solutions
Sauer Group wanted to ensure high-quality welds while reducing time and costs on a natural gas processing station project, so they used Tri Tool Inc.’s AdaptARC® system, configured for flux core arc welding (FCAW) deposition, which increased productivity 300 percent over traditional stick welding. Brian Stahovec, project superintendent for Sauer Group, said, “The welding process we’re using was developed by Tri Tool in conjunction with Sauer especially for this project. Utilizing that method, we’ve been able to not only cut costs but also make sure the schedule’s been maintained.”
Carrier Helps Hospital Earn LEED Certification and $117,000 Energy Rebate
To meet the Shore Medical Center’s goal of obtaining LEED® certification, Carrier specified a range of chillers and a web-based integration system for its new Surgical Pavilion, earning the Medical Center a $117,000 rebate from the New Jersey Clean Energy Program™ in the process.
With a Lift from Erickson, Thomas J. Dyer’s Installation, Labor Costs Plummet
Thomas J. Dyer placed six air handling units and a condenser on a plant roof in less than one hour by relying on innovative aerial service provider Erickson Incorporated. Thomas J. Dyer commissioned Erickson to lift and place the HVAC components onto curb installations on top of the Toyota Motor Manufacturing plant in Georgetown, KY. After the air handling units and condenser were placed on the single-story building by helicopter, Thomas J. Dyer crews completed the installation.
JS Thomas Service, Inc., Gets Paid Faster Using MobiliForms from iBusiness Technologies
By making the transition from paper service tickets to iPads® using iBusiness Technologies’ MobiliForms, JS Thomas Service, Inc., sped up its billing process, so now they get paid faster. The move also improved customer satisfaction. Because MobiliForms is compatible with QuickBooks®, the switch was easy.
Parker Hannifin’s Transair Aluminum Piping Helps Lynch Complete Cleanroom Retrofit in Six Months
To meet a tight deadline, William F. Lynch Co., Inc. recommended Parker Hannifin’s Transair aluminum piping over copper piping, saving installation time, labor, and material costs. By using Transair, Lynch was able to install twice the piping specified in the initial design and still finish the job on time.
EMC Sees 30-Percent Labor Savings with Victaulic 3D Renderings and Installation-Ready Couplings
Having installed Victaulic grooved products numerous times, Environmental Mechanical Contractors, Inc. (EMC) knew Victaulic could help them meet a tight deadline for renovations at Kansas’ Fort Leavenworth. Working with Victaulic’s Construction Piping Services department (CPS) to create 3D renderings of the project also allowed EMC to minimize rework and identify and troubleshoot potential problems. “We picked up a 30-percent labor savings from fabrication to install[ation]” said Marcus Howell, EMC’s senior project manager on the Fort Leavenworth project (now director of construction operations).
Viega Provides Tips for Preventing Waterborne Pathogens in Plumbing Systems
In the United States plumbing industry, focus on water quality and waterborne pathogens is increasing. For public water systems, the Environmental Protection Agency regulates 88 different contaminants. Of these, Legionella has received the most recent attention. Legionella is the bacteria that can cause legionellosis. (Legionnaires’ disease is a form of legionellosis.) If not treated properly, legionellosis can be fatal. When legionellosis occurs, building owners and engineers may face legal action and damage from negative public relations surrounding the case. Viega explains that the best defense for a commercial plumbing system is to understand waterborne pathogens and how to minimize the risks they pose.
F. W. Spencer & Son Meets Levi’s Stadium’s Tight Deadline Thanks to Jay R. Smith Prefab-Ready Products
With just over two years to build the NFL’s new Levi’s® Stadium, F. W. Spencer & Son, Inc. turned to Jay R. Smith Mfg. Co.® for products designed with prefabrication in mind, allowing them to meet the accelerated deadline. Installing a big battery of water closets typically involves prefabrication to save time, but the building of Levi’s Stadium in Santa Clara, CA, took prefab work to another level entirely. With careful planning and quick turnaround on materials, F. W. Spencer & Son succeeded in constructing all the fixtures in its warehouse and installing them in time. The stadium is home to the San Francisco 49ers.
Message from Jim Allen, M/SC Chairman: Proud To Be Partners
MCAA and our Supplier Partners know contractors aren’t just looking for solutions, you’re looking for Smart Solutions.
The Waldinger Corporation Finds PENTA Mobile App Drives Productivity and Sales
The Waldinger Corporation—a leading HVAC, plumbing, sheet metal, electrical, and service contractor with local presence throughout Iowa, Nebraska, Kansas, and Missouri—expected that using PENTA Technologies’ Mobile Field Service application would improve productivity and save money when it came to capturing and keying in information. “What we may have underestimated is the ability of our sales team to use the added abilities to market our services,” said Dave Miller, Waldinger’s senior vice president of Operations. “We have definitely had proven results on the sales and marketing fronts.”
The Real Cost of a Lost Laptop Is $49,246
Laptop computers are vital tools used by a wide population of contractors and are also the number-one risk they are facing due to theft. Since laptop computers and handheld devices are not typically used in a fixed, securable location such as a jobsite, additional measures are needed to protect them. Get started with these tips for laptop computer and mobile device security from CNA.
Geiler Plumbing Cuts Installation Times with Wayne Water Systems’ Blue Angel Pumps
Geiler Plumbing found that using Wayne Water Systems’ Blue Angel Pumps cut down their installation time, improving overall productivity. The new Blue Angel Pumps’ Pre- Assembled Back-Up and Primary System combines all the components needed for a sump pump with a high-quality backup pump and an autodialer that can notify up to five numbers.