MCAA’s mission is to guide and support member success to build a stronger, more sustainable future for the mechanical contracting industry. Through member-driven resources, comprehensive education, and strategic partnerships, we empower members to shape a future of unparalleled innovation and growth.
Latest Issue
Designing for Success with Victaulic & Heffron Company
Thanks to Victaulic’s grooved mechanical pipe-joining technology, Heffron Company overcame constraints of scale, space, and time to meet the demand for a cutting-edge 260,000-square-foot life sciences facility in Maryland. With patient safety and global medicine supply chains depending on rapid completion and a reliable system, Heffron Company took on the ambitious project and its aggressive nine-month schedule.
Martin Associates Partners with Victaulic, Stays on Budget, Ahead of Schedule
Using Victaulic grooved mechanical solutions and Construction Piping Services (CPS) for a cramped mechanical room in a new luxury apartment building, Martin Associates streamlined its drawing and installation processes, reduced waste, and cut overall project costs by three to four percent. Martin successfully installed, tested, and completed the HVAC system at 525 West 52nd Street in New York City’s Hell’s Kitchen neighborhood in a week and a half, staying on budget and ahead of schedule.
Kruse Saves Thousands Using Victaulic BIM and Products
Victaulic’s building information modeling (BIM) expertise saved Kruse Corporation an estimated $15,000 to $20,000 on the renovation of Union Station in Wichita, KS, while the streamlined construction approach reduced build hours from 4,000 to 3,100, yielding an additional $40,000 in labor savings. The combination of BIM services and Victaulic products simplified coordination, reduced risks during construction, and cut the manpower needed for this project in half.
Victaulic Prefab Strategies and Products Help Marelich Mechanical Speed Up Installation, Cut Costs
Efficient prefabrication strategies and Victaulic products made it possible for California-based Marelich Mechanical to overcome a tight timeline and space constraints for a 43,000-square-foot data center project by speeding up the installation process and keeping costs down. Marelich Mechanical constructed all of the project’s mechanical and plumbing systems in just three months.
Western Mechanical Cuts Days Off Complex Restoration with Victaulic Project Management
Victaulic’s project management, coordination, and new 3D scanning technology allowed Western Mechanical Contractors, Inc. to cut days off the schedule for a historic building renovation, cutting labor costs and keeping the project on time and within budget. The 100-year-old Detroit News Building in downtown Detroit, MI, posed several challenges to restoration—including one tenant who remained in the building throughout the project.
EMC Sees 30-Percent Labor Savings with Victaulic 3D Renderings and Installation-Ready Couplings
Having installed Victaulic grooved products numerous times, Environmental Mechanical Contractors, Inc. (EMC) knew Victaulic could help them meet a tight deadline for renovations at Kansas’ Fort Leavenworth. Working with Victaulic’s Construction Piping Services department (CPS) to create 3D renderings of the project also allowed EMC to minimize rework and identify and troubleshoot potential problems. “We picked up a 30-percent labor savings from fabrication to install[ation]” said Marcus Howell, EMC’s senior project manager on the Fort Leavenworth project (now director of construction operations).
Way Engineering Partners With Victaulic to Meet High Expectations for Houston Highrise
Way Engineering, Ltd. partnered with Victaulic to provide the HVAC mechanical work for a new Houston, TX, highrise, saving the contractor money and time throughout the complex project. Thanks in part to Way Engineering and Victaulic, the 1.14-million-square-foot Texas Tower successfully achieved LEED® Platinum status, WiredScore Platinum Certification (for digital infrastructure), and WELL™ Building Standard certification. Victaulic is a major sponsor of MCAA22.
Starting from Behind, Poole and Kent Partner with Victaulic Design Team to Finish Early
Taking over a project months into the schedule and facing an extremely tight deadline, The Poole and Kent Corporation managed to complete work 15 days early by teaming up with Victaulic’s Virtual Design and Construction (VDC) team. The Victaulic VDC team’s expertise and use of BIM software allowed Poole and Kent to plan and coordinate so that they could make up for lost time on a new Baltimore apartment building.
A. D. Winston Speeds Processes, Increases Efficiency with Victaulic
To install the mechanical system for the International Gem Tower, one of New York City’s largest HVAC installations, A. D. Winston Corporation turned to Victaulic, a global manufacturer of mechanical grooved systems and services. Contractors at A. D. Winston are well versed in working with mechanical systems in the five boroughs of New York City. The firm specializes in hotel, institution, residential, commercial, and health facilities.
Racing Ahead of Casino Schedule
To meet the tight timeline for a new multimillion-dollar casino and hotel, The Severn Group leveraged the Victaulic grooved copper system’s design flexibility and on-site fabrication capabilities to manage the project’s most critical aspects. As a result, The Severn Group was ahead of schedule on every portion of their scope of work. Victaulic is a major sponsor of MCAA24.
With HDPE Pipe and Victaulic Couplings, Shoemaker Mechanical Makes Light Work of Cooling Tower Replacement
By using high-density polyethylene (HDPE) pipe rather than carbon steel and pairing it with Victaulic’s HDPE pipe joining system, Shoemaker Mechanical replaced a cooling tower in less time than planned, with fewer people than expected, and avoided potential weather delays. Tulsa Community College’s (TCC’s) system has performed with no issues since it was installed. Victaulic is an MCAA major sponsor.
Legacy Mechanical Gets New Transit Hub on Track with Efficient Victaulic Grooved Products and Prefabrication Services
To meet the complex requirements of a massive public transit expansion, Legacy Mechanical, Inc. called on Victaulic. “We’ve worked with Victaulic grooved mechanical systems for nearly a decade so we know we can trust them to help us maximize productivity and address compressed work schedules, while increasing worker safety,” said Scott Krum, president at Legacy Mechanical. “We also know we can count on them for expert prefabrication and minimizing time in the field.”
Fresh Meadow Slashes Days Off Residential Riser Replacement Using Victaulic Couplings
With only three weeks to fully replace the riser system at a high-profile residential building, New York-based Fresh Meadow Mechanical Corp. selected Victaulic to win the race against time. Ultimately, they remained ahead of schedule, completing the entire project in only 15 days. Despite spatial constraints at various stages of the project, Fresh Meadow navigated each challenge with reliable engineered solutions that will benefit the building’s tenants and management for years to come.
Court Is In Session
Power and Combustion, Inc. partnered with Victaulic to minimize disruptions over the course of a nine-month HVAC overhaul, mitigating project risks and increasing onsite productivity while ensuring that the building—a courthouse—remained fully operational throughout construction. In the project’s second phase, Power and Combustion again leveraged Victaulic grooved solutions to enhance installation efficiency while upgrading the building’s mechanical room.
Shinn Mechanical Couples Milwaukee Tool and Victaulic to Go Extra Mile on Seattle Tunnel Project
Under pressure to make up for lost time on a huge tunneling project, Shinn Mechanical Inc. used cordless Milwaukee tools to install Victaulic grooved couplings on an innovative piping design, shaving months off the original schedule. “Pairing Victaulic couplings with Milwaukee tools allowed us to finish a job scheduled to take eight months in only 10 weeks,” said Mike Shinn, company founder.
U.S. Engineering Company Improves Productivity, Cuts Costs Using Prefabrication with Victaulic Grooved Technologies
For U.S. Engineering Company, finding creative ways to keep the University of Colorado Hospital’s (UCH’s) new expansion on track helped them increase productivity while delivering on schedule and on budget. To maximize productivity, U.S. Engineering decided on a multi-trade prefabrication process using Victaulic grooved systems whenever and wherever possible.
Maxair Mechanical and Victaulic Streamline Complex Med School Project From Design to Startup
For a new, state-of-the-art medical school campus, Maxair Mechanical saved valuable time by installing “miles of piping” using Victaulic products rather than welding and relying on Victaulic’s 3D models of the mechanical space to anticipate potential pitfalls and avoid costly delays. Streamlining processes at every opportunity, Maxair completed the project on time, despite labor and supply chain challenges. Victaulic is a major sponsor of MCAA23.
Victaulic Helps Rado Enterprises Maximize Efficiency
To maximize the benefits of using building information modeling (BIM), and to keep the Penn State Hershey Medical Center expansion project on schedule, Rado Enterprises of Bloomsburg, PA, turned to Victaulic. With proven experience installing grooved products in various HVAC systems since they began fabrication shop operations more than 15 years ago, Rado Enterprises knew that Victaulic grooved products provided a number of benefits over welding, such as ease of installation and maintenance, ability to meet demanding schedules, and decreased liability. What they learned with this project was the benefit of Victaulic’s project management services.