Smart Solutions Case Studies

Smart Solutions case studies highlight how MCAA contractors and Manufacturer/Supplier Council members collaborate to improve productivity, manage costs, and solve real‑world project challenges. Each case study focuses on practical applications of products, technologies, and processes that deliver measurable results across mechanical construction, service, fabrication, and operations.

Through real project examples, Smart Solutions provides insight into how contractors are applying innovative solutions to streamline workflows, improve coordination, and enhance overall performance. Explore the case studies below to identify ideas, approaches, and proven practices that can be adapted to your own operations.

Filters

Category

Manufacturer/ Supplier

Contractor

Transforming Operations with Real-Time Visibility with Access Coins & P1 Construction, LLC

P1 Construction, LLC replaced its outdated legacy enterprise resource planning (ERP) system with Access Coins ERP and quickly started saving money, increasing productivity, and improving service delivery. Morgan Lassise, P1 Construction accounting manager, explained, “Access Coins has been perfect for us because it meets all the needs that we have as a contractor. We’re seeing increased job productivity across the board.”

https://staging.mcaa.org/manufacturers/access-coins/Access Coins

P1 Group Gains a Competitive Advantage with Victaulic

Victaulic’s Construction Piping Services (CPS) division helped P1 Group, Inc. win the bid for a major hospital expansion project by creating a 3D model of the mechanical systems, electrical systems, and ductwork. In the bid, P1 Group also made the case for Victaulic grooved mechanical piping systems for the project to save time and costs on installation.

https://staging.mcaa.org/manufacturers/victaulic/Victaulic

P1 Group Installs Aquatherm PP-R Piping, Saving Time When Every Second Counts

By using Aquatherm polypropylene-random (PP-R) Blue Pipe® to replace carbon-steel pipe at Berry Global’s injection-molding facility, the P1 Group of Lawrence, KS, successfully completed installation in just 24 hours. The lightweight pipe is easy to transport and easy to join using a flameless heat-fusion technique that saves time. The speed of installation was more than just a productivity win for the contractor; at Berry Global, a mere half-second loss in production time can cost tens of thousands of dollars.

https://staging.mcaa.org/manufacturers/aquatherm/Aquatherm LP