Smart Solutions Case Studies

Smart Solutions case studies highlight how MCAA contractors and Manufacturer/Supplier Council members collaborate to improve productivity, manage costs, and solve real‑world project challenges. Each case study focuses on practical applications of products, technologies, and processes that deliver measurable results across mechanical construction, service, fabrication, and operations.

Through real project examples, Smart Solutions provides insight into how contractors are applying innovative solutions to streamline workflows, improve coordination, and enhance overall performance. Explore the case studies below to identify ideas, approaches, and proven practices that can be adapted to your own operations.

Filters

Category

Manufacturer

Contractor

The Promise of HDPE Pipe: F.W. Webb Explains

As communities face challenges with aging water and underground infrastructure, an increasing number of contractors are discovering the benefits of HDPE pipe to address those challenges. HDPE is a cost-effective, easy-to-install, and versatile piping material for any underground utility project—from communications, electrical, and geothermal to sewer and domestic water. Contractors have used HDPE for over 50 years, yet its applications continue to expand, particularly in water and sewer line upgrades.

F.W. Webb Company

With F.W. Webb Support, Mollenberg-Betz Meets Demands of Massive Manufacturing Plant Project

Because of the “design-on-the-fly” approach to building a solar panel manufacturing plant, Mollenberg-Betz, Inc., does not always know which products it will need and when, but it does know that F.W. Webb Company will provide just what they need when they do. The two have teamed up to provide engineered process piping solutions throughout the 1.2-million-square-foot SolarCity facility under construction in Buffalo, NY.

F.W. Webb Company

Preventing a Prolonged Power Plant Shutdown

Through a preventative maintenance program, F.W. Webb Company found and fixed oil leaks at a New Hampshire power plant that could have caused major problems. Instead of a long shutdown that could have affected electricity customers across New England, F.W. Webb completed repairs during a planned two-week plant closure.

F.W. Webb Company