Smart Solution Landing Page

MCAA’s mission is to guide and support member success to build a stronger, more sustainable future for the mechanical contracting industry. Through member-driven resources, comprehensive education, and strategic partnerships, we empower members to shape a future of unparalleled innovation and growth.

Filters

Category

Manufacturer

Contractor

Conti Corporation Cuts Installation Time with Erickson Incorporated Aerial Lift and Placement

Innovative aerial service provider Erickson Incorporated successfully conducted 13 chiller equipment lifts to the top of the JPM Chase building in Belleville, MI, in just two-and-a-half hours, allowing Conti Corporation to cut installation time dramatically. Erickson’s placement lifts saved time on the ground and also saved labor costs, because they were much more efficient than standard ground-based methods.

Erickson Incorporated

Erickson’s Aircrane Cuts The Hill Group’s Installation Time Down to Hours

In the summer of 2016, The Hill Group called on Erickson Inc. to lift and place cooling towers and chillers by air into a building in crowded downtown Chicago, accomplishing the goal in hours compared with weeks needed for other methods. The project was located at East Randolph Street in a crowded landscape with multilevel streets and nearby residential buildings, so land crane equipment was not an option. Using Erickson’s precision capabilities, aerial crane operators placed chiller equipment through a hole in the roof, with inches to spare, and then set it 15’ below the roof level.

Erickson Incorporated

With a Lift from Erickson, Thomas J. Dyer’s Installation, Labor Costs Plummet

Thomas J. Dyer placed six air handling units and a condenser on a plant roof in less than one hour by relying on innovative aerial service provider Erickson Incorporated. Thomas J. Dyer commissioned Erickson to lift and place the HVAC components onto curb installations on top of the Toyota Motor Manufacturing plant in Georgetown, KY. After the air handling units and condenser were placed on the single-story building by helicopter, Thomas J. Dyer crews completed the installation.

Erickson Incorporated

Erickson’s Aircrane Lift Saves JW Danforth Weeks of Installation Time, Costs

To keep on track with its project timeline, John W. Danforth Co. turned to Erickson Incorporated, a global provider of innovative aerial services, to place 44 sections of rooftop HVAC units securely in place in just one day. Erickson flew a Sikorsky S64 Aircrane helicopter above SolarCity’s 1.2-million-square-foot factory in Buffalo, NY. The Aircrane has a 25,000-pound lift capacity and easily carried the HVAC units—weighing between 14,000 and 18,000 pounds—in less than seven hours.

Erickson Incorporated